![]() |
Heritage West Indies 36 |
||||||||||||||||||||||||||||||||||||||||||||
| A Charley Morgan Design | |||||||||||||||||||||||||||||||||||||||||||||
| HOME :: | |||||||||||||||||||||||||||||||||||||||||||||
Accolade Re-fit Centerboard Sheeve Box Replacement The main job was to replace the old centerboard mechanism. Everything in the bilge was rotted out, including the centerboard lift. I think many WI36 owners can profit from it. We had a new pully fabricated. It's all stainless. The material including bolts was about $110, and the welding about $160. The old system was only held by 2 rusty bolts (lucky us she didn't sink!!). There was always salt water in the bilge, so the SS pipe had pi holes, and water would get in the bilge.
|
|||||||||||||||||||||||||||||||||||||||||||||